TAZARA Postpones Resumption of Mukuba Cross-Border Passenger Train Service

TAZARA has postponed the Mukuba Cross-Border Passenger Train resumption to 7 July 2026 after a further railway accident on the Nakonde–Mwenzo section.

    Lorem ipsum dolor sit

    Lorem ipsum dolor sit amet, consectetur adipiscing.

    Lorem ipsum dolor sit amet, consectetur adipiscing.

    Lorem ipsum dolor sit amet, consectetur adipiscing.

    Lorem ipsum dolor sit amet, consectetur adipiscing.