Passenger Rail Services Resume to António Agostinho Neto International Airport

Regular passenger rail services between Bungo Station and the AIAAN railway terminal have resumed after a 10-month suspension, with four daily inter-station frequencies.

    Lorem ipsum dolor sit

    Lorem ipsum dolor sit amet, consectetur adipiscing.

    Lorem ipsum dolor sit amet, consectetur adipiscing.

    Lorem ipsum dolor sit amet, consectetur adipiscing.

    Lorem ipsum dolor sit amet, consectetur adipiscing.